Steamboat Building in Elizabeth, PA

A Journal of daily activities at the Elizabeth Marine Ways 1898 to 1925 

February 22, 1924

Home ] Up ] January 1924 ] February 15, 1924 ] [ February 22, 1924 ] March 1, 1924 ] March 12, 1924 ] April 1924 ] May 3, 1924 ] May 10, 1924 ] June 1924 ] July 1924 ] August 1, 1924 ] August 20, 1924 ] September 8, 1924 ] September 23, 1924 ] October 1924 ] December  1924 ]

 

 

This journal page has been typed.  To view the actual journal entry click on the image below.

 

February 22, 1924


 

I am writing these two Jobs correctly as further on they are mixed up

Steamer Creighton docked Friday February 22, 1924 and General repairs    on(e) of her sides was held on by the sheet iron, she was condemed and ordered repaired by US Inspectors.

16 full length floores    24 tops & fud (possibility a reference to futtocks1) on each side    at this hole new inside strakes   nosing   plank shear   Boiler deck   all bulkheads   rudder irons   Hull calked   Wheel repaired  30 arms  new bucketts all around   Machinery repaired and lined up   aft end of boilers raised 5 in   new Jackets around chain and braces   new Trumpet line   Decks all repaired   chain adjusted and small repairs all over the Boat          William Lynch JR Foreman and lines     Tom Hudson  Captain     Finished Friday February 22, 1924

1 "One of the curved timbers in a built-up or compound rib or frame of a vessel."  The top (timber) is, "The timber above the futtocks in a built up rib or frame."

February 22, 1924

Click on image to view full page.

Back Home Up Next