February
26, 1923 to March 20, 1923
February 26,
1923 building 4 wheel barrows for Carnegie Steel
March 1, 1923
repairing pipe work J.C. Risher
Steamer J.C. Risher March
6, 1923 new 3/4 tie rod in coal box
Steamer
Ranger March 6, 1923 repairs to wheel and sliding doors at
F. hatches
Barges and
Flats B 31 - B 83 - sunk B 95 - sunk B 63 - B 67
March 8,
1923 Cyclone Digger lifting spuds out of Collier #4
March 10,
1923 calking sides of Collier #4 and 4 flats from the water line
up
March 12,
1923 J.C. Risher repairs to sheave box and end of C. timber
March 10,
1923 unloading liners and grate bars out of RR Car P.&L.E.
31459
New Pump boat
for Mines Dept 3'2" x 12' x 36(') with Cabin and skylight
finished March 26, 1923
March 19,
1923 puting fir sticks in the River 20 x 20 x 100
March 20, 1923
sawing 20 x 20 x 100 fir for Dock 6