Steamboat Building in Elizabeth, PA

A Journal of daily activities at the Elizabeth Marine Ways 1898 to 1925 

April 4, 1923

[ Home ] [ Up ] [ 1923 ] [ January 2, 1923 ] [ January 10, 1923 ] [ February 1, 1923 ] [ February 16, 1923 ] [ March 1, 1923 ] [ March 21, 1923 ] [ April 4, 1923 ] [ April 23,1923 ] [ May 1923 ] [ July 1923 ] [ August 1923 ] [ September 1, 1923 ] [ September 12, 1923 ] [ November 1, 1923 ] [ November 27,1923 ] [ December 1923 ]

 

 

This journal page has been typed.  To view the actual journal entry click on the image below.

 

April 4, 1923 to April 18, 1923


 

April 4, 1923 working on a loose rail # 1-2 track

4th - 5 - 6 - 1923   bulkheading in old Hull of Steamer Pearsy damaged by Steamer Voyager on the 2nd

shiped 3 new 16 ft Yawls for Converse Company April 12, 1923

Steamer Voyager scrubing - furnace work - Boiler work   repairing B.D. and side E.R. bulkheads  April 11, 1923

Steamer Sunshine Docked Friday April 13, 1923

High Water April 14 - 15, 1923   men pushing out drift and tying up spar triped and broke

April 19, 1923   Dynamiting of wreck of Model barge V Below Ways      Mr. J. Frank Tilley  Direction

April 20, 1923  geting 8 oak logs out of a Barge at Dock 6

April 16 to 23, 1923   Cleaning up yards and washing mud after high water left everything in bad shape   the water was up to RR track and repairing tracks - ( same job )

April 18, 1923   unloaded two cars of Oak on RR sideing    Pennsy 292048  -  B & O 137933

April 4, 1923 to April 18, 1923

Click on image to view full page.

Back Home Up Next