May
10, 1924 to May 28, 1924
Steamer
Conqueror Docked May 10, 1924 she hit the Rochester
Bridge and buckeled her midship to the Port side
8" Straightened and repaired May 12, 1924
High Water May
13, 1924 - 30 ft 7" This was a muddy rise
Cleaning up from May 14, 1924 to July 1, 1924
Steamer
Ranger Wheel Job May 20, 1924
Building new 9
ft gang way from the River to the top at the Office May 27, 1924 and
platform around front of the office finished June 20, 1924
built
this gangway out of almost new 3" fir that came off the bottom of a
U.S.E. flat the high water left on the Ways Barge Yard. Harry Barr and
part of his men done this work
Steamer
Conqueror straightened new top and middle gunnels - new plank
shear and nosing along the new gunnels - new beam ends on both
sides - new deck on the guards - S. log slapjacked in 2 places - 4
new side stanchion - chocks & Kevels reset - sheet and
nosing iron replaced - bottom searched - butts calked - Deck calked
and pitched - 1 new Knocker block - B. deck rail repaired - Chains
adjusted Finished and out 5 PM May 28, 1924